The trial assembly was conducted to validate the structural fit and interface precision before mass production and site delivery. All main structural sections were lifted and aligned according to the field installation sequence.
Key technical verifications during the process included:
Verticality tolerance of the main column sections
Flange plate mating accuracy
Bolt hole alignment rates across all joints
Data collected during the trial confirms that the fabrication quality meets the specified design requirements. This step reduces on-site adjustment work and shortens the overall installation timeline once the tower is shipped to the project site.