This week, our company shipped 60M, 80M, 100M, and 120M angle steel towers in batches to the UAE, totaling 22 containers. From the start of production to the completion of shipment, we maintained maximum efficiency, completing the process within 30 days. The packaging used non-woven fabric and steel strapping, applying different colors to the packaging to indicate the different tower heights and wooden blocks were used as padding inside the containers to prevent friction damage











Procurement guide for engineers sourcing radar towers: technical specs, supplier evaluation questions, RFQ checklist, and factory trial assembling explained. By XH Tower.




